The status of the construction of the KLOE Drift Chamber is reviewed. With its 4 m diameter, it will be the biggest drift chamber ever built. The stringing of 52 000 wires is a titanic effort: details are given about the semiautomatic system, the quality tests on wires and the monitoring of end-plates deformations.

The construction of the KLOE Drift Chamber: present status

V. Elia;GORINI, Edoardo;PANAREO, Marco;PRIMAVERA, Margherita;SPAGNOLO, Stefania Antonia;
1998-01-01

Abstract

The status of the construction of the KLOE Drift Chamber is reviewed. With its 4 m diameter, it will be the biggest drift chamber ever built. The stringing of 52 000 wires is a titanic effort: details are given about the semiautomatic system, the quality tests on wires and the monitoring of end-plates deformations.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11587/368328
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 1
social impact