Sfoglia per Autore
Simulation of tool and part flow in FMSs
1995-01-01 Grieco, Antonio Domenico; Semeraro, Q.; Tolio, T.; Toma, S.
SIMAN (R) implementation of manufacturing models defined with UML: Application to a real case
1999-01-01 Anglani, Alfredo; Grieco, Antonio Domenico; Pacella, Massimo; Semeraro, Q.; Tolio, T.
A new algorithm to rank temporal fuzzy sets in fuzzy discrete event simulation
2000-01-01 Anglani, Alfredo; Grieco, Antonio Domenico; Nucci, F.; Semeraro, Q.; Tolio, T.
A sound analysis of fuzzy simulation time advance mechanisms.
2000-01-01 Anglani, A.; Grieco, Antonio Domenico; Nucci, F.; Semeraro, Q.; Tolio, T.
Object oriented simulation Models based on the devs formalism
2000-01-01 Anglani, A.; Grieco, Antonio Domenico; Guerriero, Emanuela; Semeraro, Q.; Tolio, T.
Object Oriented Simulation Models Based On The Devs Formalism
2000-01-01 A., Anglani; Grieco, Antonio Domenico; Guerriero, Emanuela; Nucci, Francesco; Q., Semeraro; T., Tolio
New policy to manage tools in flexible manufacturing systems using network part programs
2000-01-01 Grieco, Antonio Domenico; Nucci, Francesco
A fuzzy approach to a robust schedule of identical parallel machines with sequence dependent set-up costs.
2001-01-01 Anglani, A.; Grieco, Antonio Domenico; Guerriero, Emanuela; Semeraro, Q.; Tolio, T.
An open-source visual environment for discrete event simulation: deos
2001-01-01 Caricato, Pierpaolo; Grieco, Antonio Domenico; Nucci, Francesco; Zacchino, Sandro; Anglani, Alfredo
A review of different approaches to the FMS loading
2001-01-01 Grieco, Antonio Domenico; Semeraro, Q.; Tolio, T.
A framework for long term capacity decisions in advanced manufacturing systems
2002-01-01 Grieco, Antonio Domenico; Brandimarte, P.; Perrone, G.; Sergi, V.; Tolio, T.
Heuristic Algorithms for the Scheduling of Parallel Machines with Sequence Dependent Set-up Costs
2002-01-01 Grieco, Antonio Domenico; Guerriero, Emanuela; R. MUSMANNO AND A., Anglani
Process and production planning in manufacturing enterprise networks
2002-01-01 Cantamessa, M.; Fichera, S.; Grieco, Antonio Domenico; LA COMMARE, U.; Perrone, G.; Tolio, T.
A CAD environment for the numerical simulation of servo pneumatic actuator systems
2002-01-01 Anglani, Alfredo; Gnoni, D.; Grieco, Antonio Domenico; Pacella, Massimo
Object-Oriented modeling and simulation of FMSs: a rule-based procedure.
2002-01-01 Grieco, Antonio Domenico; Pacella, Anglani; Tolio,
Object-oriented modeling and simulation of flexible manufacturing systems: a rule-based procedure
2002-01-01 Anglani, Alfredo; Grieco, Antonio Domenico; Pacella, Massimo; Tolio, T.
A proposal of a distributed component environment for the integration of simulation models
2002-01-01 Anglani, Alfredo; Grieco, Antonio Domenico; Pacella, Massimo; Colizzi, L.
Representation of fuzzy time variables in discrete event simulation
2003-01-01 Grieco, Antonio Domenico; Nucci, Francesco; Anglani, Alfredo
Long-term planning in manufacturing production systems under uncertain conditions
2003-01-01 Caricato, P.; Grieco, Antonio Domenico; Nucci, F.; Anglani, Alfredo
A simulated annealing approach for scheduling of non-independent jobs on FSMP
2003-01-01 Caricato, P.; Grieco, Antonio Domenico; Pacella, M.
Titolo | Data di pubblicazione | Autore(i) | File |
---|---|---|---|
Simulation of tool and part flow in FMSs | 1-gen-1995 | Grieco, Antonio Domenico; Semeraro, Q.; Tolio, T.; Toma, S. | |
SIMAN (R) implementation of manufacturing models defined with UML: Application to a real case | 1-gen-1999 | Anglani, Alfredo; Grieco, Antonio Domenico; Pacella, Massimo; Semeraro, Q.; Tolio, T. | |
A new algorithm to rank temporal fuzzy sets in fuzzy discrete event simulation | 1-gen-2000 | Anglani, Alfredo; Grieco, Antonio Domenico; Nucci, F.; Semeraro, Q.; Tolio, T. | |
A sound analysis of fuzzy simulation time advance mechanisms. | 1-gen-2000 | Anglani, A.; Grieco, Antonio Domenico; Nucci, F.; Semeraro, Q.; Tolio, T. | |
Object oriented simulation Models based on the devs formalism | 1-gen-2000 | Anglani, A.; Grieco, Antonio Domenico; Guerriero, Emanuela; Semeraro, Q.; Tolio, T. | |
Object Oriented Simulation Models Based On The Devs Formalism | 1-gen-2000 | A., Anglani; Grieco, Antonio Domenico; Guerriero, Emanuela; Nucci, Francesco; Q., Semeraro; T., Tolio | |
New policy to manage tools in flexible manufacturing systems using network part programs | 1-gen-2000 | Grieco, Antonio Domenico; Nucci, Francesco | |
A fuzzy approach to a robust schedule of identical parallel machines with sequence dependent set-up costs. | 1-gen-2001 | Anglani, A.; Grieco, Antonio Domenico; Guerriero, Emanuela; Semeraro, Q.; Tolio, T. | |
An open-source visual environment for discrete event simulation: deos | 1-gen-2001 | Caricato, Pierpaolo; Grieco, Antonio Domenico; Nucci, Francesco; Zacchino, Sandro; Anglani, Alfredo | |
A review of different approaches to the FMS loading | 1-gen-2001 | Grieco, Antonio Domenico; Semeraro, Q.; Tolio, T. | |
A framework for long term capacity decisions in advanced manufacturing systems | 1-gen-2002 | Grieco, Antonio Domenico; Brandimarte, P.; Perrone, G.; Sergi, V.; Tolio, T. | |
Heuristic Algorithms for the Scheduling of Parallel Machines with Sequence Dependent Set-up Costs | 1-gen-2002 | Grieco, Antonio Domenico; Guerriero, Emanuela; R. MUSMANNO AND A., Anglani | |
Process and production planning in manufacturing enterprise networks | 1-gen-2002 | Cantamessa, M.; Fichera, S.; Grieco, Antonio Domenico; LA COMMARE, U.; Perrone, G.; Tolio, T. | |
A CAD environment for the numerical simulation of servo pneumatic actuator systems | 1-gen-2002 | Anglani, Alfredo; Gnoni, D.; Grieco, Antonio Domenico; Pacella, Massimo | |
Object-Oriented modeling and simulation of FMSs: a rule-based procedure. | 1-gen-2002 | Grieco, Antonio Domenico; Pacella, Anglani; Tolio, | |
Object-oriented modeling and simulation of flexible manufacturing systems: a rule-based procedure | 1-gen-2002 | Anglani, Alfredo; Grieco, Antonio Domenico; Pacella, Massimo; Tolio, T. | |
A proposal of a distributed component environment for the integration of simulation models | 1-gen-2002 | Anglani, Alfredo; Grieco, Antonio Domenico; Pacella, Massimo; Colizzi, L. | |
Representation of fuzzy time variables in discrete event simulation | 1-gen-2003 | Grieco, Antonio Domenico; Nucci, Francesco; Anglani, Alfredo | |
Long-term planning in manufacturing production systems under uncertain conditions | 1-gen-2003 | Caricato, P.; Grieco, Antonio Domenico; Nucci, F.; Anglani, Alfredo | |
A simulated annealing approach for scheduling of non-independent jobs on FSMP | 1-gen-2003 | Caricato, P.; Grieco, Antonio Domenico; Pacella, M. |
Legenda icone
- file ad accesso aperto
- file disponibili sulla rete interna
- file disponibili agli utenti autorizzati
- file disponibili solo agli amministratori
- file sotto embargo
- nessun file disponibile